Water, Diamer Bhasha Dam and Sino-Pak Collusion By Lt Gen P R Shankar (R)



 Figure 1 Water Vs Population

 

Beggars can’t be choosers. However, they do have a choice of place for begging. Yesterday, Pakistan begged at the US, Saudi and Gulf street corners. Today it is the Chinese, Turkish, and Malaysian street corners. Pakistan can beg for everything, but no one can give it water. Pakistan is going to be a ‘DRY’ frontline geostrategic pivot as it plummets into absolute water scarcity. Under this cloak, Pakistan and China have hastened the deal to build the Diamer Bhasha dam on R Indus in Gilgit Baltistan. It is being touted as Pakistan’s ‘Three Gorges’ to eternally ensure water security.  There is nothing farther than the truth. The dam represents Sino Pak collusion with an unmistakable Chinese Military Civil Fusion stamp.  This is not a water scarcity alleviation project but a long-term military plan against India which is the result of China being stymied in Eastern Ladakh.   

 

Pakistan’s Water Problem

 

In the 90s, Pakistan became a water stressed nation (see graph). Around 2005, it became water scarce. After 2025, it will enter the absolute water scarcity zone. It will also enter the realm of  perpetual failure. The situation is scary. If the economy was dead earlier, the pandemic is burying it. Bailouts/loans/aid do not cater for water. Pakistan’s military spending bloats continually. An impoverished Pakistan is sliding unchecked into absolute water scarcity. This situation will become irrevocable despite the Diamer Bhasha Dam.  Pakistan faces an existential crisis from lack of water. Two World Bank Documents Pakistan Country Water Resources Assistance Strategy, Water Economy: Running Dry of 2005 and Pakistan Getting More from Water of 2019encapsulate Pakistan’s water problems comprehensively.  

 

 Figure 2  Graph Showing Water Status of Pakistan

 

Pakistan is well endowed with water. In fact only 16 countries have more water.  On the other hand, 32 countries have less water per-capita than Pakistan. However the average per-capita GDP of 26 such countries is 10 times that of Pakistan. Pakistan’s water consumption is dominated by agriculture, which contributes around 1/5th  to GDP. The four major crops (wheat, rice, sugarcane, and cotton) consume  80% percent of all water  and generate under 5 % of GDP.

 

Pakistani Water security has two dimensions - poor water resource management and poor water service delivery (irrigation, drainage, domestic water supply and sanitation). 

Climate change and global warming, population and economic growth will increase water requirements and variability of availability. Accelerated glacial melting increases flash floods risks in the upper Indus Basin. In the lower Indus Basin, sea level rise and reduced flows of the river due to upstream dams exacerbate seawater intrusion into the delta and coastal groundwater.    

Pakistan’s, water problems are multidimensional. Firstly. It is solely dependent on the Indus River - a single source, high risk geographic fate.  Secondly. Exploding population and depleting water resources. Thirdly. Pakistani water storage capability was barely 30 days in 2005 (much lesser today due to silting). In comparison,  USA has 900 days and India has 120-220 days capacity. Fourthly. Its two major water reservoirs, Tarbela and Mangla are silted up. Both dip to dead water levels in summer. Fifthly.  Available water is conveyed at  about 40% efficiency only. Sixthly. Ground  water is over exploited and depleting alarmingly. Fresh water bodies are shrinking. 70% of underground and lake water, is unfit for drinking and harmful for crops. Bacterial, arsenic and other toxic contamination is high. 1/4th of the population may be at risk from arsenic contamination of drinking water. Seventhly. Raised embankments in the lower Indus have restricted  river meandering. Sedimentation has increased bed levels.  Flooding and drainage problems have resulted.  Eighthly.  Climate change is causing variability of water flows. This either causes floods or droughts unpredictably. Ninthly.   Its water infrastructure is poorly maintained and rarely upgraded.  Governance deficit is high and project implementation is poor. Tenthly.  It is broke. No one pays for water. This was effective since ‘freedom at midnight’ circa 14 Aug 47.   Lastly. By 2025, 50% of Pakistan will urbanised, where severe water deficiency is the norm.  What does the future hold for Pakistan sans water?

The Diamer Bhasha Dam


Increasing Pakistan’s overground water storage revolves  around building two dams. One at Kalabagh, which has greater potential and benefit. The other at Diamer-Bhasha which is complex and risky. The Pakistanis have suddenly opted for the later after four decades.

 

Figure 3 Virtual Representation of Diamer Bhasha Dam

Diamer Bhasha, a multi-purpose mega-dam will be now be built by Chinese on Indus near Chilas. It falls in the  Khyber Pakhtunkhwa and Gilgit-Baltistan areas.  At a height of 272m, Diamer Bhasha will be the tallest roller compacted concrete dam in the world. The financial outlay was $12-14bn. It will have a power generating capacity of 4.5GW, and water storage capacity of 6.4 million acre-feet of water. The dam only compensates for progressive loss of storage capacity due to silting of older dams at Tarbela and Mangla besides others. Even this will decrease progressively due to sedimentation. Pakistan’s overall storage capacity is likely to remain at 30 days or below only. It was announced on 27 Jul 20 that the dam is ready for construction; which is expected to start now and be completed by 2029.  80% of the land for the dam had been acquired earlier.


Figure 4 Artist View of Diamer Bhasha Dam

The Diamer Bhasha Dam is  controversial.  It is located in Indian territory. It is in a high seismic zone and its height is of serious concern. The weight of the large water body in the catchment area could trigger sympathetic tremors during any regional seismic activity. It will have an ecological fallout like unseasonal rains, landslides and floods that might affect the adjacent areas in Pakistan as well as in India. The dam  faces local resistance, since it will submerge about 50 villages upstream. More than 35000 people  will get displaced and sent to areas afar. There is also a dispute between local tribes over compensation. There is a domestic dispute between  Gilgit Baltistan and Khyber Pakhtunkhwa over claims on  the royalty from the dam. There is a grouse that Punjab will be the main beneficiary. Residents are also protesting the destruction of historical Buddhist sculptures, inscriptions and petroglyphs in 50 villages, which will be submerged once the dam is operational. 

 

World Bank, Asian Development Bank and other financial institutions consistently refused to finance the dam. They wanted an NOC from India  being in disputed territory.  Initially this project was part of CPEC. It was withdrawn from the CPEC  in 2018, due to China’s strict conditions. Thereafter a crowd funding exercise was started at the behest of a Supreme court judge. That failed. Out of the blue , a  joint venture between Power China ( a Chinese state-run firm)  and Pakistan's Frontier Works Organization (a commercial arm of Pakistan's military) signed the contract for the Dam construction. The contracted  sum is $2.75 billion whereas the original outlay was $14 billion. 70% share is Chinese and 30% Pakistani. The details of funding as usual are opaque and fishy.

 

Analysis

 

It has been claimed that the dam will alleviate Pakistan’s water scarcity.  However  going by the World Bank recommendations (see graphic below), If an equivalent amount is spent in other areas of water services delivery and water resources management which are more urgent and less complex, Pakistan will benefit far more. Any dam is the least urgent and most complex option to mitigate Pakistan’s water woes. Yet Pakistan has opted for this option. It set aside the more beneficial Kalabagh option and has gone in for the risky and complex dam at Diamer Bhasha. Two issues emerge clearly. One. Pakistan’s slide into absolute water scarcity will continue. Two. The Diamer Bhasha Dam is not about Pakistan’s water problem but beyond that. 

Figure 5 World Bank Recommendation for Mitigation

 

The newfound acceptance of the Chinese proposal (earlier rejected) and Pakistani Army shepherding the project as a partner clarifies that this is a long term joint military project and not about water at all. By the first week of June 20 it was clear that (a) Chinese aggressiveness in Eastern Ladakh was stymied (b) an impoverished Pakistan cannot assist China militarily from the West beyond a point.  If a credible collusive threat must be posed from the West, Chinese presence and resources must bolster Pakistan. In this context the Dam fits into the design. The haste in starting the project in Jul 20 in the presence of the Paki COAS puts issues into perspective.       

 

The dam  is alongside the CPEC main artery. It meets the Pakistani water requirement and enables infrastructure build up simultaneously. Security of investment and personnel justifies Chinese military presence. Diamer Bhasha and Chilas areas give China and Pakistan the ideal base for incremental build-up of force and its application from the West in conjunction with a thrust from Tibet onto Eastern Ladakh. This area enables development of  multiple offensive options through Kargil or Western Ladakh. The ultimate idea would be to connect Tibet and POK directly. The CPEC can then follow the easier  Indus or Shyok axes rather than the torturous Kunjerab Pass. This was long thought of as a fantasy option. It is no more that. It  is a very likely option in the coming decade.  

  

 

 Figure 6 Map Showing Diamer Bhasha in Relation to CPEC

The Indian response must be to modernise its Armed Forces to be able to handle this pincer in a parallel time frame. That is obvious. However a wider perspective is needed. Pakistan’s new map to include J&K and Ladakh as part of its territory and its collusion with China to build a dam in our territory at some level repudiates the Simla Agreement and the Indus Water Treaty.  We must therefore commence activities to retake POK as outlined in an earlier article and pursue the water scarcity issue in Pakistan. The tenor  of Th Muivah’s, (Chief of NSCN (IM)) recent reiteration of the demand for a separate Naga flag and constitution and the signals emanating from Myanmar and Nepal are clearly indicative of Chinese insidious  machinations as again outlined earlier. We also need to take the issue across into Tibet and Xinjiang to dissuade the Chinese from undertaking any misadventure. We must make Pakistan and China look inwards and options for that are many – kinetic and  non-kinetic. We need to get our act together.   

Comments

  1. Well analyzed Ravi......we have to be militarily well prepared for the pincer move

    ReplyDelete
  2. Insightful and noteworthy Sir. Hope our Govt is alive to the situation as it pans out. Fantastic analysis as always...

    ReplyDelete

Post a Comment

Popular posts from this blog

THE POST BALAKOT REVIEW BY LT GEN P R SHANKAR (R)

The Pakistani FM to BBC: War would be suicidal. Pakistan has already started negotiating with a gun to its head! Welcome home Wing Commander Abhinanadan. Well done. You flew into the Valley of Death and survived.  India is proud. Sincere condolences to Air Marshal Waseem Ud Din on the loss of his son Shahaz Ud Din under most unfortunate circumstances. He was incredibly brave to continue his mission when others had turned around.   Paradigm Emerged A lot has happened since Balakot. Some in focus some out. Some hyped. Some diffused. Time to sum up the situation and see where things are heading. Militarily it is called Review of the Situation. I will do it journalistically so that the intellectual western media understands it. They might or not buy our story. Incidentally it is not a story. It is not for sale. This is real live action. Nuclear exchange receding. Not ruled out.     A fundamental paradigm has emerged. India’s fight is against terror. The D

GUNNERS SHOT HITS THE MILLION MARK

IT GIVES ME A GREAT SENSE OF PRIDE THAT ' GUNNERS SHOT ' HAS HAD ITS  'MILLIONTH VIEWER'  TODAY MORNING.  PLEASE SEE THE TABLE BELOW.                                 I STARTED THE BLOG IN MARCH 2019 WHEN SOME OF MY ARTICLES WERE REJECTED BY NATIONAL MEDIA AND REPUTED PLATFORMS. THEY PROBABLY FELT THAT MY  ARTICLES DO NOT DESERVE  SPACE IN THEIR PUBLICATIONS. HOWEVER I THANK THEM FOR NUDGING ME TO STRIKE OUT ON MY OWN.     SO I SET MY OWN STANDARDS.    I ALSO COULD NOT COMPROMISE IN PUTTING ACROSS MY VIEW POINT THE WAY I FELT IT WAS NECESSARY FOR EVERYONE TO KNOW. I CHOSE TO BE UNBIASED AND EXPRESS WHAT IS GOOD FOR INDIA WITHOUT ANY COLOURING.  I HAVE ALSO FELT THAT IT IS IMPORTANT FOR EVERY INDIAN TO KNOW WHAT IS RELEVANT FOR OUR SECURITY IN AS SIMPLE TERMS AS POSSIBLE. IT IS ONLY THEN THAT HE WILL BE ABLE TO APPRECIATE AND SUPPORT THE ARMED FORCES IN THEIR ENDEAVOUR TO PROTECT OUR NATION. OUR MEN AND OFFICERS WHO ARE SERVING ARE THE BEST AND DESERVE OUR GRATITUDE FOR

A FRAMEWORK FOR DEFENCE INTERACTION WITH IITS By LT GEN P R SHANKAR (R)

This is an extension of my article  Defence Technology - An Indian Conundrum KNOWLEDGE IS POWER.  IT COMES FROM RESEARCH. RESEARCH GENERATES TECHNOLOGY . TECHNOLOGY OWNED IS CHEAP. TECHNOLOGY BOUGHT IS COSTLY From Oxymoronism to a Framework India lacks adequate defense technology. It needs to invest in defense R&D if it must be a power of reckoning. It needs to break its trader mentality. It needs need leadership and massive involvement of our academics in research. These oxymorons are well known. That is probably why the PM has asked the IITs to contribute by coming up with indigenous defense technologies. So far so good. How does one do it? That has been our zillion-dollar question. The fact that outsiders have been better at tapping our brain power and technological potential is also another oxymoron. Hence, I am shifting from pontificating to suggesting a framework on which this entire thought process should progress. So, let us begin with a SWOT